Executive Summary

This Environmental Impact Assessment (EIA) evaluates the potential environmental effects of the TKO Tunnel to Lam Tin project. The assessment covers all phases of the project from construction through operation, examining impacts on marine ecology, air quality, noise levels, and other environmental factors.

The study concludes that with proper implementation of mitigation measures and monitoring programs, the project's environmental impacts can be maintained within acceptable limits while delivering significant transportation benefits to the community.

Project Description

The TKO Tunnel is a 4.2-kilometer dual-bore tunnel connecting Tseung Kwan O to Lam Tin. The project involves marine construction activities, tunnel boring operations, and the installation of comprehensive mechanical and electrical systems.

Tunnel Length

4.2 kilometers

Maximum Depth

60 meters below sea level

Traffic Capacity

6 lanes (3 in each direction)

Construction Period

2024 - 2028

Marine Ecology Impact

The marine ecology assessment examined potential impacts on water quality, marine life, and benthic communities. Key findings include:

Water Quality

Low Impact

Temporary increases in turbidity during construction, managed through silt curtains and monitoring.

Marine Life

Low Impact

Minimal disruption to fish populations with seasonal construction restrictions during spawning periods.

Coral Communities

Minimal Impact

No direct impact on coral communities with buffer zones maintained around sensitive areas.

Air Quality Impact

Air quality modeling was conducted to assess potential impacts from construction activities and future tunnel operations. The assessment considered dust generation, vehicle emissions, and ventilation system performance.

Current Air Quality Baseline

PM2.5 18 μg/m³ Good
PM10 32 μg/m³ Good
NO2 28 μg/m³ Good

Noise Assessment

Noise impact assessment evaluated construction noise and operational noise levels. Modeling results indicate compliance with Hong Kong noise standards with implementation of appropriate mitigation measures.

Noise Compliance Standards

Period Limit (dB) Predicted (dB) Status
Daytime (7AM-7PM) 70 65 Compliant
Evening (7PM-11PM) 60 55 Compliant
Night (11PM-7AM) 45 40 Compliant

Mitigation Measures

Comprehensive mitigation measures have been developed to minimize environmental impacts throughout the project lifecycle:

Marine Environment

  • Deployment of silt curtains during marine works
  • Real-time water quality monitoring
  • Seasonal restrictions during fish spawning periods
  • Marine mammal observation protocols

Air Quality

  • Water spraying for dust suppression
  • Covered material transport vehicles
  • Regular equipment maintenance
  • Air quality monitoring stations

Noise Control

  • Noise barriers around construction sites
  • Restricted working hours
  • Use of quieter construction equipment
  • Community noise monitoring

Environmental Monitoring Program

A comprehensive monitoring program has been established to track environmental parameters throughout construction and operation phases:

Water Quality Monitoring

Frequency: Daily during marine works, weekly otherwise

Parameters: Turbidity, dissolved oxygen, pH, suspended solids

Locations: 8 monitoring stations around construction areas

Air Quality Monitoring

Frequency: Continuous monitoring

Parameters: PM2.5, PM10, NO2, SO2

Locations: 6 monitoring stations in surrounding communities

Noise Monitoring

Frequency: Continuous during construction hours

Parameters: LAeq, LA90, LA10

Locations: 10 monitoring points at sensitive receivers

Conclusions

The Environmental Impact Assessment concludes that the TKO Tunnel project can be implemented with acceptable environmental impacts through proper implementation of mitigation measures and monitoring programs.

Overall Environmental Impact

Acceptable with Mitigation

Compliance Status

Fully Compliant

Monitoring Requirements

Comprehensive Program Active

The project will deliver significant transportation benefits while maintaining environmental protection standards. Continuous monitoring and adaptive management will ensure ongoing compliance throughout the project lifecycle.