TKO Tunnel to Lam Tin

Project Scope

Detailed scope and components of the TKO-LLT infrastructure project

Project Components

The TKO-LLT project encompasses multiple interconnected components designed to create a comprehensive transportation solution. Each element has been carefully planned to ensure seamless integration with existing infrastructure while meeting future demands. Learn about our innovative design features and safety systems.

Main Tunnel Structure

4.2km dual-bore tunnel with 3 lanes in each direction, featuring advanced ventilation and safety systems.

  • Reinforced concrete construction
  • Waterproof membrane system
  • Emergency escape routes
  • Fire suppression systems

Ventilation Systems

State-of-the-art mechanical ventilation ensuring air quality and emergency smoke extraction.

  • Jet fan ventilation
  • Air quality monitoring
  • Emergency smoke extraction
  • Fresh air supply systems

Traffic Management

Intelligent traffic control systems with real-time monitoring and incident management.

  • CCTV surveillance network
  • Variable message signs
  • Traffic flow sensors
  • Incident detection systems

Safety & Emergency

Comprehensive safety infrastructure including emergency exits, communication systems, and response protocols.

  • Emergency telephone systems
  • Cross-passage connections
  • Fire detection systems
  • Emergency lighting

Approach Roads

New connecting roads and improvements to existing infrastructure at both tunnel portals.

  • TKO portal connections
  • Lam Tin portal access
  • Traffic signal optimization
  • Pedestrian facilities

Control Systems

Centralized control room with integrated monitoring and management of all tunnel operations.

  • 24/7 monitoring center
  • Integrated control systems
  • Maintenance scheduling
  • Performance analytics

Construction Phases

1

Site Preparation

Land acquisition, utility relocation, and site establishment

6 months
2

Tunnel Excavation

Boring operations using tunnel boring machines (TBM)

24 months
3

Infrastructure Installation

Mechanical, electrical, and safety systems installation

18 months
4

Testing & Commissioning

System testing, safety certification, and trial operations

6 months

Technical Standards

Design Standards

Compliant with Hong Kong Transport Department guidelines and international tunnel design standards

Safety Standards

Meets NFPA 502 tunnel fire safety standards and local emergency response requirements

Environmental Standards

Environmental Impact Assessment approved with comprehensive mitigation measures

Quality Standards

ISO 9001 quality management system throughout design and construction phases