TKO Tunnel to Lam Tin

Overview of TKO-LLT

Comprehensive overview of the Tseung Kwan O to Lam Tin Tunnel project

Project Introduction

The Tseung Kwan O to Lam Tin Tunnel (TKO-LLT) is a major infrastructure project designed to provide a direct and efficient transportation link between Tseung Kwan O and Lam Tin. This strategic tunnel will significantly improve connectivity and reduce travel times for residents and businesses in both areas. Learn more about why we need this tunnel.

As part of Hong Kong's comprehensive transportation network development, the TKO-LLT represents a crucial investment in the region's future growth and sustainability. View our current progress and explore the innovative design features that make this project unique.

Technical Specifications

Total Length

Approximately 4.2 kilometers

Lanes

Dual 3-lane carriageways

Maximum Depth

Up to 60 meters below sea level

Design Speed

80 km/h maximum speed limit

Route Description

Starting Point - Tseung Kwan O

The tunnel begins near the TKO Industrial Estate, connecting to the existing road network and providing easy access from residential and commercial areas.

End Point - Lam Tin

The tunnel emerges in the Lam Tin area, providing direct access to Kwun Tong District and connections to major transportation hubs.

Project Timeline

Planning Phase

2020-2022

Design & Approval

2022-2024

Construction

2024-2028

Opening

2028

Project Statistics

4.2km Total Length
6 Traffic Lanes
60m Maximum Depth
8-12min Travel Time