Tseung Kwan O - Lam Tin Tunnel

Tseung Kwan O - Lam Tin Tunnel

Font Size: S | M | L | Site Map | Desktop Version | English | 繁體 | 简体

Project Background

The Tseung Kwan O – Lam Tin Tunnel is a dual-two lane highway of approximately 4.2 km long, connecting Tseung Kwan O and East Kowloon. The Tseung Kwan O – Lam Tin Tunnel, together with the Trunk Road T2 in Kai Tak Development and Central Kowloon Route, will form Route 6 in the strategic road network providing an express link between Kowloon West and Tseung Kwan O. The Route 6 will also mitigate the road traffic condition of central and eastern Kowloon.

Project Management : Civil Engineering and Development Department
Consulting Engineers : AECOM Asia Co. Ltd.
Project Progress : Detailed design and construction in progress
Investigation and Preliminary Design : From early 2009 to mid 2013
Detailed Design : From end 2013 to end 2016
Contruction : From July 2016 to mid 2021