Project Background
The Tseung Kwan O – Lam Tin Tunnel is a dual-two lane highway of approximately 4.2 km long, connecting Tseung Kwan O and East Kowloon. The Tseung Kwan O – Lam Tin Tunnel, together with the Trunk Road T2 in Kai Tak Development and Central Kowloon Route, will form Route 6 in the strategic road network providing an express link between Kowloon West and Tseung Kwan O. The Route 6 will also mitigate the road traffic condition of central and eastern Kowloon.
Project Management | : | Civil Engineering and Development Department |
Consulting Engineers | : | AECOM Asia Co. Ltd. |
Project Progress | : | Detailed design and construction in progress |
Investigation and Preliminary Design | : | From early 2009 to mid 2013 |
Detailed Design | : | From end 2013 to end 2016 |
Construction | : | From July 2016 to mid 2021 |